Before the audit
An organisation chooses a certification body, ideally one Accredited for that standard and sector. The body agrees the scope: which activities, sites and people the certificate will cover. It then calculates audit time from the number of staff, the complexity of the work and the number of sites, following international rules.
The organisation should have run its management system for long enough to show results, including at least one internal audit and one management review.
Initial certification: two stages
Stage 1 checks readiness. The auditor reviews documented information, confirms the scope, looks at the site and plans stage 2. Gaps found here are reported so they can be fixed in time.
Stage 2 is the main audit. The auditors interview staff, observe work and sample records to judge whether the system is in place and working effectively. They report findings at a closing meeting.
The audit team does not grant the certificate. A person in the certification body who was not on the audit reviews the evidence and makes the certification decision.
Surveillance and recertification
A management system certificate is normally valid for three years. Under ISO/IEC 17021-1, surveillance audits take place at least once each calendar year except the recertification year, and the first must fall within 12 months of the certification decision. Each surveillance audit samples part of the system, always including internal audit, management review and complaints.
Before the certificate expires, a recertification audit reviews the whole system again over the past cycle. A successful result starts a new three-year cycle. If the recertification is not completed in time, the certificate lapses.
Nonconformities and corrective action
A nonconformity is a requirement that has not been met. Certification bodies grade them.
A major nonconformity affects the system's ability to achieve its intended results, for example a required process missing entirely. It must be corrected and verified before a certificate is issued or renewed, which may mean a follow-up visit.
A minor nonconformity is a lapse that does not undermine the system as a whole. The organisation submits a plan, and the auditor checks that it worked at the next audit.
The response has two parts. A correction fixes the immediate problem, such as updating an out-of-date record. A corrective action removes the root cause so the problem does not recur. Auditors expect both, with evidence.
Points to remember
- Stage 1 checks readiness. Stage 2 checks the system works.
- The certificate lasts three years, with yearly surveillance.
- Major nonconformities block certification until closed.
- Fix the cause, not only the symptom.
Related courses
- ISO 19011:2018 Directrices para la auditoría de los sistemas de gestión
- ISO/IEC 27006-1:2024 Requirements for bodies providing audit and certification of information security management systems
- ISO 9001:2026 Sistemas de gestión de la calidad - Requisitos
- ISO/IEC 27001:2022 Sistemas de gestión de la seguridad de la información - Requisitos
Sources
- ISO, Certification: https://www.iso.org/certification.html
- ISO, Management system standards: https://www.iso.org/management-system-standards.html
- Global ACI, About the Global ACI MRA (ISO/IEC 17021-1 as a main scope): https://global-aci.org/en/about-the-global-aci-mra/
- IAF (archived), mandatory documents, including IAF MD 5 on audit time: https://iaf.nu/en/home/
Free explainer. No enrolment, test or certificate. Written by CFC Knowledge and Standards in its own words from the public sources listed; it does not reproduce ISO text.